Final ACCWP FY 25-26 Pgm Annual Report
Provision C.22 of the San Francisco Bay Regional Water Quality Control Board’s Municipal Regional Stormwater Permit (MRP) (Order No. R2-2022-0018, as amended, NPDES No. CAS612008) requires the Permittees covered by the MRP to submit Annual Reports by September 30 of each year that document the implementation of MRP requirements during the previous Fiscal Year (FY, July 1 through June 30). This Program Annual Report describes the activities that were conducted by the Program, the Bay Area Municipal Stormwater Collaborative (BAMSC), and the California Stormwater Quality Association (CASQA) on behalf of the Alameda Permittees during the previous FY.